LOFT WRAP
 
 
space
 
 
Installation
 

• Check the area you are insulating and make any needed
repairs before installing Loft Wrap.
• Unroll the Loft Wrap as you work, and cut it to suitable lengths
with scissors or utility knife.
• Staple the Loft Wrap to the undersides of exposed rafters or
between the rafters, ensuring a ventilation gap of at least
50mm above the Loft Wrap.
• Tape the joints of the loft wrap to give a vapour seal and
increase the thermal value of the Loft Wrap.
• If you wish to board out the roof please ensure a gap of 25mm
to the underside of the Loft Wrap before boarding.
• See diagrams right for fitting options and roof coverage

 
 
 
Technical
     
FOR A WARMER, MONEY SAVING ENVIRONMENT
 
©ThermaWrap 2007